Warwick Middle School

wms1 wms2 wms3 wms4


Client's Goal:

The Warwick School District wanted to upgrade its middle school into a state-of-the-art, modern facility with a highly versatile performance space, a modern, technologically-equipped meeting space in the library, and an updated audio system in various rooms in the school.

Project Details:

Clair Brothers provided system consulting and design services as well as site coordination and installation of the audio, video and theatrical lighting system in the auditorium. We also installed an AV system for the library and a high-quality audio system in the fitness center, gymnasium and cafeteria.







The Clair Brothers Difference:

Because this was a renovation and expansion of an existing facility, the middle school was fully operational during the construction. This created extended constructions delays which ultimately compressed our timeline for the AV installations. While this was a challenge, we are experienced in operating under tight timeframes, and our “the show must go on” mentality enables us to complete the work on time.
Partners:
  • Theatre Projects Consultants
  • Engineering Harmonics
joomla template

One Clair Boulevard • Manheim, PA 17545